1. To ensure a clean operating environment of the ventilation duct fabric, before suspending the ventilation duct fabric, start the air conditioner and blow out the dust, debris, and other stolen goods left in the air conditioner.
2. To ensure the cleanliness of the ventilation duct fabric, please wash your hands before touching ventilation duct fabric. Any material that comes into contact with the ventilation duct fabric should also be cleaned before use.
3. According to the label serial number on the ventilation duct fabric, according to the different system numbers, they are sorted and placed in a clean environment.
4. According to the installation system number marked on the drawing, hang the ventilation duct fabric in turn. When installing each system, start from the first section (ie No. ***.1); the ventilation duct fabric zipper head of each system is In the direction of the noon clock.
5. Put the first section of ventilation duct fabric on the reserved port of the main air supply duct, and fix it with fastening tape. The zipper part of the ventilation duct fabric can be exposed to the reserved opening of the air duct; the fastening belt must be locked, and it should be carefully checked to confirm that it is locked. If necessary, auxiliary materials can be used to lock it.
6. Suspend the ventilation duct fabric on the slide rail according to the sequence number of the label on the ventilation duct fabric from small to large, close the zipper between the sections and cover the cap.
7. After each system is suspended, stretch the ventilation duct fabric flat, and fix the last hook with a lock, so that no wrinkles can appear.